Quick answers.Clear assumptions.
Boiler-room calculations for the number you need right now. Change any input and every result updates instantly.
Input-to-output converter
Conversion assumptions
Opening + louver sizing
The 80% default reflects the requested 20% louver allowance. Actual certified free area can vary substantially. Verify the appliance instructions, adopted code, duct configuration, local authority, and louver manufacturer’s data before design or installation.
Boiler efficiency savings
The $1.08/therm statewide planning default converts the June 2026 EIA Ohio commercial average of $11.22/Mcf at 10.37 therms per Mcf. Your actual delivered bill rate is the right number to use. Check current Ohio data ↗
Water flow
Head converter
Expansion tank estimator
Estimate a new system
The system-volume presets are planning factors derived from Bell & Gossett’s average component-volume table. Enter calculated system gallons when available. Maximum operating pressure is normally kept below the relief setting. View engineering method ↗
Replace a gravity / compression tank
This conversion uses the published pressure relationship between an atmospheric steel compression tank and a precharged diaphragm tank. Confirm the old tank’s actual volume, operating pressures, tank location, relief setting, and the selected manufacturer’s acceptance rating. View replacement method ↗
